9.07: Difference between revisions

From Arizona Citizen Voice
Created page with "'''Risk Assessment''' '''Principle 9 - Identify, Analyze, and Respond to Change''' '''Attribute''' '''9.07''' - Management develops and documents a change assessment process based on the risk assessment process described in principle 7. The process includes procedures for identifying, analyzing, and responding to risks related to significant changes."
 
 
(3 intermediate revisions by the same user not shown)
Line 4: Line 4:


'''Attribute''' '''9.07''' - Management develops and documents a change assessment process based on the risk assessment process described in principle 7. The process includes procedures for identifying, analyzing, and responding to risks related to significant changes.
'''Attribute''' '''9.07''' - Management develops and documents a change assessment process based on the risk assessment process described in principle 7. The process includes procedures for identifying, analyzing, and responding to risks related to significant changes.
'''>>>Navigational Buttons<<<'''
* '''[[Index of Attributes]]'''
* '''Previous Attribute - [[9.06]]'''
* '''Next Attribute - [[9.08]]'''
__FORCETOC__
=== Jamie's Story ===
==== [[June 25, 2025: Runbeck Contract Delivered]] ====
Contractual changes may have been necessary during the Covid-19 pandemic and associated public health mandates during the 2020 General Election and 2022 Mid-term Election. However, no change justification package was provided with the Runbeck contract. Most concerning is the Disaster Recovery portion of the contract; the change was significant, but doesn't appear to have the appropriate approval signatures.
=== Election Anomalies ===
===== [[Dropbox Collection (2020)|Maricopa Dropbox Collection (2020)]] =====
Governance issues identified from [https://www.azag.gov/sites/default/files/2025-06/2020_General_Election_Investigation_Summary.pdf Arizona Attorney General's Office 2020 General Election Investigation] of Arizona Senate allegations of Maricopa County Election Department - Drop Box Collections issues. As previously stated, in Attribute 9.06, MC changes were being made, which resulted in procedure violations. Apparently, there was no process to address these challenges.

Latest revision as of 18:02, 11 September 2026

Risk Assessment

Principle 9 - Identify, Analyze, and Respond to Change

Attribute 9.07 - Management develops and documents a change assessment process based on the risk assessment process described in principle 7. The process includes procedures for identifying, analyzing, and responding to risks related to significant changes.

>>>Navigational Buttons<<<


Jamie's Story

Contractual changes may have been necessary during the Covid-19 pandemic and associated public health mandates during the 2020 General Election and 2022 Mid-term Election. However, no change justification package was provided with the Runbeck contract. Most concerning is the Disaster Recovery portion of the contract; the change was significant, but doesn't appear to have the appropriate approval signatures.

Election Anomalies

Governance issues identified from Arizona Attorney General's Office 2020 General Election Investigation of Arizona Senate allegations of Maricopa County Election Department - Drop Box Collections issues. As previously stated, in Attribute 9.06, MC changes were being made, which resulted in procedure violations. Apparently, there was no process to address these challenges.