9.01: Difference between revisions

From Arizona Citizen Voice
No edit summary
 
Line 21: Line 21:


=== Jamie's Story ===
=== Jamie's Story ===
No examples are available to illustrate governance gaps for this attribute.
 
==== [[June 25, 2025: Runbeck Contract Delivered]] ====
Contractual changes may have been necessary during the Covid-19 pandemic and associated public health mandates during the 2020 Presidential Election and 2022 Mid-term Election. However, no change justification package was provided with the Runbeck contract. Most concerning is the missing analysis requirement of this Attribute.  


=== Election Anomalies ===
=== Election Anomalies ===
No examples are available to illustrate governance gaps for this attribute.
No examples are available to illustrate governance gaps for this attribute.

Latest revision as of 17:10, 11 September 2026

Risk Assessment

Principle 9 - Identify, Analyze, and Respond to Change

Attribute 9.01 - Management should identify, analyze, and respond to significant changes that could impact the internal control system.

Green Book Attribute Categories for Principle 9

The following attributes contribute to the design, implementation, and operating effectiveness of this principle:

  • Identify Significant Changes
  • Establish a Change Assessment Process
  • Identify, Analyze, and Respond to Risks Related to Significant Changes

>>>Navigational Buttons<<<


Jamie's Story

Contractual changes may have been necessary during the Covid-19 pandemic and associated public health mandates during the 2020 Presidential Election and 2022 Mid-term Election. However, no change justification package was provided with the Runbeck contract. Most concerning is the missing analysis requirement of this Attribute.

Election Anomalies

No examples are available to illustrate governance gaps for this attribute.